Project description
The project included the conversion of a coal-fired boiler with heavy refractory OP140 into a boiler fired with natural gas and mine gas. The project included design work, delivery of gas installations and burners, and modernization of the boiler furnace. The boiler was launched after modernization by the commissioning department at SBB ENERGY S.A. All of the works were performed at the SYNTHOS chemical plant in Oświęcim.
Project details
- Category: Gas power generation, General contracting
- Project location: SYNTHOS Chemical Plant, Oświęcim
- Project date: 2018-2020
- Project contractor: Synthos Dwory 7 spółka z ograniczoną odpowiedzialnością spółka jawna