Providing specialized and comprehensive operational services in CHP Czechnica Plant, Siechnica
Project description
The aim of the project is a new, low-emission, environmentally friendly investment. The power source is natural gas. The role of peak and reserve boilers 4 x KOG 38 MW. is to operate at peak heat demand, when the operation of the gas and steam unit operating in the base is insufficient. Boilers are also used as a backup in case of possible failures of basic production equipment.