Constraction of CCPP, Żerań CHP Plant, WarsawProject descriptionProviding services associated with CCPP commissioning at Żerań CHP Plant in Warsaw (496 MW) Project detailsCategory: Commissioning, Gas power generationProject location: Żerań CHP PlantProject date: 01.06.2020 - 31.03.2021Project contractor: POLIMEX MOSTOSTAL S.A.
Electrical and I & C Installation, Gas power generationComprehensive assembly and delivery of equipment, cables and I&C equipment, Dolna Odra Power Plant, Nowe Czarnowo
Commissioning, Conventional power generationConstruction of BW 100 power unit, Zakłady Azotowe „Puławy” S.A.
Electrical and I & C Installation, Gas power generation Installation of I&C systems and elements of the HDCS system along with the delivery of material Czechnica CHP Plant, iechnica
Gas power generation, General contractingConstruction of a gas-fueled cogeneration source based on a set of gas engines with a power of up to 50 MWe, Gdynia CHP Plant
Commissioning, Gas power generationCommissioning a steam boiler using gas fuel with a capacity of 100 t/h along with auxiliary installations, Grupa Azoty Zakłady Azotowe Kędzierzyn S.A
Commissioning, Conventional power generationOperaiting maintenance of WTP, Turów Power Plant, Bogatynia