Conventional power generation, Mechanical erectionModernization of the urea injection system (SNCR) for units 1-3, Turów Power Plant.
Electrical and I & C InstallationEI&C works – Start-up of Baghouse Filter for New Boiler, Fortum Zabrze CHP Plant
Electrical and I & C InstallationModernization works of a system at BASF Catalyst Production Plant in Środa Śląska
Electrical and I & C InstallationModifications in pumps drives for power units 3 and 4, Opole Power Plant
Electrical and I & C InstallationWorks at vegetable conveying line in Nutricia Zakłady Produkcyjne Sp. z o.o.
Electrical and I & C InstallationInstallation of the control system for the I&C sector at the BASF Catalyst Production Plant- Środa Śląska
Electrical and I & C InstallationSupervision Inspector for the Automation System at Łódź CHP Plant (EC-4)
Conventional power generation, Electrical and I & C InstallationRetrofit of AP4 turbine generator unit – Legnica CHP Plant
Electrical and I & C InstallationI&C installation works and start-up of biomass feeding system to boiler no. 2. – Opole Power Plant
Biomass boilers, RDF, incinerators, Conventional power generation, Mechanical erectionReduction of NOx emissions from Boiler No. 3, Opole Power Plant.