Optimization of a process system of boiler no. 9, SYNTHOS Chemical Plant, OświęcimProject descriptionStocktaking, diagnostic testing and optimization of a process system of boiler no. 9 at SYNTHOS Plant. Project detailsCategory: General contractingProject location: SYNTHOS Chemical Plant, OświęcimProject date: 2018Project contractor: SYNTHOS S.A.
Conventional power generation, General contractingImplementation of a mercury reduction system and modernization of the electrostatic precipitator for unit No. 9 at the Pątnów – Adamów – Konin Power Plant Group
Conventional power generation, General contractingFlue gas denitrification installation, Przyjaźń CHP Plant, Zabrze
Conventional power generation, General contractingConstruction of the flue gas treatment installation, Północ CHP Plant, Południe CHP, Radom
General contractingInstallation of environmental protection installations on KFA and KFB boilers, Żerań CHP Plant, Warsaw
Conventional power generation, General contractingSCR installation, Vesuvius Skawina Production Plant
Conventional power generation, General contractingGeneral contracting for B1 and B2 boilers, Kosovo Power Plant, Kosovo
Biomass boilers, RDF, incinerators, General contractingDevelopment of high-efficiency cogeneration based on biomass, Łąkowa Heat and Power Plant, Grudziądz
Conventional power generation, General contractingConstruction of SCR installation for the OOG-320 boiler (K3), Orlen CHP Plant, Płock
Gas power generation, General contractingConstruction of a gas-fueled cogeneration source based on a set of gas engines with a power of up to 50 MWe, Gdynia CHP Plant