Electrical and I&C systems installation

Principal
Customer
Scope of work Completion date
Balcke Dürr Polska Sp. z o.o.
PGE GiEK SA Opole Power Plant


Modernization of electrostatic precipitators on blocks 1 to 4 - adaptation to BAT conclusions in PGE GiEK S.A. Opole Power Plant

2018-10-05 to 2022-04-29
ASKOM Spółka z o.o.
BASF Środa Śląska


Assembly and commissioning of I & C equipment related to the expansion of the BASF factory in Środa Śląska

2018-05-16 to 2019-01-16
ABB SP Z O.O.
Elektrociepłownia Siekierki

Installation works (electric and I&C) in CHP Siekierki, FGD, SCR K2.

2016-03-01 to 2016-07-01
PGE GiEK S.A. Oddział Elektrownia Opole
Opole Power Plant

Changes in pump drives PX1 for units 3 and 4.

2015-10-01 to 2016-05-01
PROCOM - SYSTEM S.A.
PGE GiEK S.A. Opole Power Plant

Reconstrucyion in the field of conveyors belonging to the fuel transportation system.

2015-11-01 to 2016-04-01
PGE GiEK S.A. Oddział Elektrownia Opole
Opole Power Plant

Delivery and start-up of automated control SZR/PPZ system of distribution board 6kV RR-2.

2015-12-01 to 2016-04-01
PCC ROKITA S.A.
CHP Brzeg Dolny

Project works for generator 6MWe in PCC Rokita in Brzeg Dolny.

2015-12-01 to 2016-04-01
NUTRICIA Zakłady Produkcyjne Sp. z o.o.
NUTRICIA Zakłady Produkcyjne Sp. z o.o

Disassembly and assemby of electric devices and I&C for vegetables transportation lines in NUTRICIA. Disassembly of existing drives, relocation of devices and their reinstallation. Delivery of cables and exchange of cable circuits.

2015-11-01 to 2015-12-01
Siemens Sp. z o.o.
PGE GiEK S.A. Opole Power Plant

Disassembly and assembly of system cabinets - Project Opole unit 3.

2015-08-01 to 2015-11-01
Przedsiębiorstwo Wielobranżowe "Kord" Sp. z o.o.
CHP Plant Legnica

Execution of renovation of the turbine unit TG-2 in CHP Plant - 4 Legnica.

2015-10-01 to 2015-11-01
Siemens
Oczyszczalnia Ścieków Warszawa

Participation in commissioning of electrical and I&C part

2009-12-01 to 2014-12-01
Mostostal Zabrze S.A.
BASF Polska

Full-scope execution of the control system and I&C part for BASF Catalyst Production Plant in Środa Śląska

2013-08-06 to 2014-01-02
Mostaostal S.A.
Power Plant Opole

I&C and Electrical assembly. Instalation of biomass commissioning.

2011-08-01 to 2013-01-01
Tauron Ciepło S.A.
EC Tychy

Execution of installation works and start- up of the field I&C part for a BFB fluidized bed boiler in Tychy CHP Plant.

2012-01-02 to 2013-01-01

Elektrociepłownia Tychy

 I&C works realization.

2012-07-06 to 2012-11-30
ControlTec Sp. z o.o.
Elektrociepłownia Elbląg

I&C assembly - biomass unit

2012-07-02 to 2012-09-25
ControlTec Sp. z o.o.
Szczecin CHP Plant

Installation of electric and I&C equipment at biomass

2011-01-01 to 2011-09-01
Nutricia Polska Sp. z o.o.
Nutricia

Works on LV side

2005-03-15 to 2010-12-31
Kogeneracja S.A.
Wrocław CHP Plant

Implementation of changes into the control and protection system of OP-230 K1 boiler

2009-12-01 to 2010-08-31
Beck & Politzer Polska Sp. z o.o.
Nutricia

Relocation of control system of chutes and arch breakers

2010-04-23 to 2010-04-30
Askom Sp. z o.o.
Dulux

Installation works of electric and I&C part in Pilawa Dulux

2009-12-01 to 2010-02-23
Aviation Institute
Aviation Institute

Providing expert’s opinion on DC motor retrofit

2009-11-09 to 2009-11-26
Askom Sp. z o.o.
Turów Power Plant

Execution of works under retrofit of automatic level control in potable water tanks at pump room

2008-07-18 to 2009-09-30
Fabryka Pudliszki S.A.
Pudliszki Factory

Supply and installation of electric and I&C part

2009-02-27 to 2009-08-31
Arctic Paper Kostrzyn S.A.
Arctic Paper Kostrzyn

Supply and installation of electric part of gas and steam power unit at APK2

2008-11-17 to 2009-08-31
Askom Sp. z o.o.
Turów Power Plant

Work under rehabilitation system

2007-08-08 to 2009-08-30
ControlTec Sp. z o.o.
Dolna Odra Power Plant

Installation works of electric part at FGD Plant of units 1 and 2

2009-08-04 to 2009-08-10
Kogeneracja S.A.
Wrocław CHP Plant

Supplementing of DCS with additional ROFA signals for K-1 boiler

2009-04-01 to 2009-04-20
ICI Pilawa
Dulux Pilawa

Supply and installation of electric and I&C part

2009-02-01 to 2009-02-20
Kord Sp z. o.o.
Legnica CHP Plant

Execution of works under renovation of turbin unit no. 2

2008-09-15 to 2009-01-15
Nutricia Polska Sp. z o.o.
Nutricia

Retrofit of boilers – electric and I&C part

2008-12-10 to 2008-12-31
Elektrobudowa Jaworzno
Wroclaw CHP Plant

Supply and installation of TB1 transformer gate

2008-11-01 to 2008-11-15
SNC Lavalin Polska Sp. z o.o.
Patnow II Power Plant II

Installation works of electric part

2006-03-08 to 2008-10-31
Askom Sp. z o.o.
Laziska Power Plant

Fabrication of control cabinet

2008-10-01 to 2008-10-30
Mirare Sp. z o.o.
Nutricia Opole

Cabling installation for visual monitoring system

2008-10-01 to 2008-10-20
Askom Sp. z o.o.
Turow Power Plant

Execution of works under retrofit of automatic level control in potable water tanks at pump room

2008-07-18 to 2008-09-30
Gemco

Prefabrication of control cabinet and its installation on site in Dąbrowa Górnicza

2008-05-23 to 2008-09-23
Askom Sp. z o.o.
Radlin Coke Plant

Prefabrication of control cabinet for Radlin Coke Plant

2008-07-07 to 2008-08-26
Askom Sp. z o.o.
Nutricia Opole

Electric and I&C works of CIP washing line (chemical cleaning of food production system)

2008-07-01 to 2008-07-15
Egbud Sp. z o.o.
Industrial WWT Plant in Turów Power Plant

Installation of electric and I&C part and start-up of installed systems

2007-03-29 to 2008-02-22
Askom Sp. z o.o.
Nutricia Opole

Installation works in electric and I&C part at Nutricia production department

2007-02-01 to 2007-12-31
Principal
Customer
Scope of work Completion date
ELEMONT SP. Z O.O
PGE GiEK S.A. Oddział Elektrownia Opole

Installation and lightening in buildings 5UHA and 6UHA in the construction of power units in Opole Power Plant..

form 2015-12-01