Modernization of the inlet to the FGD absorber, Pątnów II Power Plant, Konin
Project description
Lining the bottom of the absorber stub with corrosion-resistant material ALOY 59 and installing a sediment washing installation to eliminate ash and gypsum deposits in the channel at Pątnów Power Plant.