Commissioning of CCPP, Wolfsburg, GermanyProject descriptionParticipation in the commissioning works of two gas and steam units with a total electrical power of 288 MW and thermal power of 265 MW, replacing the existing units no. 10 and 20 at the HKW West on the VW automotive factory grounds in Wolfsburg. Project detailsCategory: Commissioning, Gas power generationProject location: CCPP, Wolfsburg GermanyProject date: 11.07.2022 - 30.05.2024Project contractor: Mitsubishi Hitachi Power Systems Europe
Electrical and I & C Installation, Gas power generationComprehensive assembly and delivery of equipment, cables and I&C equipment, Dolna Odra Power Plant, Nowe Czarnowo
Commissioning, Conventional power generationConstruction of BW 100 power unit, Zakłady Azotowe „Puławy” S.A.
Electrical and I & C Installation, Gas power generation Installation of I&C systems and elements of the HDCS system along with the delivery of material Czechnica CHP Plant, iechnica
Gas power generation, General contractingConstruction of a gas-fueled cogeneration source based on a set of gas engines with a power of up to 50 MWe, Gdynia CHP Plant
Commissioning, Gas power generationCommissioning a steam boiler using gas fuel with a capacity of 100 t/h along with auxiliary installations, Grupa Azoty Zakłady Azotowe Kędzierzyn S.A
Commissioning, Conventional power generationOperaiting maintenance of WTP, Turów Power Plant, Bogatynia