Development of high-efficiency cogeneration based on biomass, Łąkowa Heat and Power Plant, Grudziądz
Project description
Development of high-efficiency cogeneration through the construction of a biomass single-boiler unit at Łąkowa Heat and Power Plant in Grudziądz
Construction of a biomass boiler unit at Łąkowa CHP Plant in Grudziądz, including:
- Delivery of a 12.5 MW biomass boiler;
- Delivery of a biomass feeding system;
- Construction of a biomass storage and connecting link;
- Modification of the existing boiler house for the installation of the new boiler;
- Delivery of a flue gas cleaning system with a fan, flue gas ducts, and connection to the existing chimney;
- Construction of a combustion waste building (slag and ash);
- Modernization of the existing heat exchanger station;
- Power supply system for the new boiler and facilities/installations, modernization of the SO3 switchgear;
- Modernization of roads and yards;
- Installation of an acoustic screen;
- Design;
- Deliveries, installation;
- Commissioning, optimization.
Project details
- Category: Biomass boilers, RDF, incinerators, General contracting
- Project location: Łąkowa Heat and Power Plant, Grudziądz
- Project date: 2022-2024
- Project contractor: OPEC GRUDZIĄDZ Sp. z o.o.