Realizacje
Construction of SCR installation for the OOG-320 boiler (K3), Orlen CHP Plant, Płock
Project description
Adaptation of the OOG 320 boiler no. K3 for burning COO as the primary fuel, alternatively fueled by a mixed fuel (COO + gas). The main goal of the project is to adapt the boiler to the requirements arising from the Regulation of the Minister of Climate and Environment dated September 24, 2020, on emission standards for certain types of installations, fuel combustion sources, and fuel combustion or waste co-combustion devices (Journal of Laws 2020, item 1860) and the new, much stricter requirements specified in the Directive of the European Parliament and of the Council of Europe 2010/75/EU of November 24, 2010, on industrial emissions – integrated pollution prevention and control, known as the IED Directive.
Project details
- Category: Conventional power generation, General contracting
- Project location: Orlen CHP Plant, Płock
- Project date: 2023-2024
- Project contractor: ORLEN S.A