Construction of SCR deNOx system, Bydgoszcz CHP Plant
Project description
Construction of a catalytic flue gas denitrification installation for OP-230 boilers No. 3 and 4 at Bydgoszcz CHP Plant
- Design;
- Delivery and installation:
- unloading and storage station for ammonia water (DRIM);
- compressor station along with electrical and I&C switchgear (technical building);
- SCR reactor for boilers K3 and K4 along with reagent preparation and injection system;
- flow system components;
- flue gas fans (4 units) with the replacement of existing foundations;
- modernization of OPP for boiler K3;
- Commissioning and start-up of the installation;
- Optimization;
- Handover to the user;
- Supervision during the warranty period.
Project details
- Category: Conventional power generation, General contracting
- Project location: Bydgoszcz CHP Plant
- Project date: 2017-2018
- Project contractor: PGE GIEK S.A.