Comprehensive assembly and delivery of equipment, cables and I&C equipment, Dolna Odra Power Plant, Nowe CzarnowoProject descriptionInstallation and delivery of materials and instrumentation equipment for the installation of the Gas and Steam Unit (BGP 2x700MWe), including: installation of complete measurement systems,, signal/control and I&C communication cables, installation of cable structures for instrumentation and control cables, installation of junction boxes and protective cabinets, functional tests Project detailsCategory: Electrical and I & C Installation, Gas power generationProject location: Dolna Odra Power Plant, Nowe CzarnowoProject date: 2022-2024Project contractor: Polimex Mostostal S.A.
Conventional power generation, Electrical and I & C InstallationDesign, delivery and assembly of complete drive systems for air and exhaust gas fans for unit No. 4, Połaniec Power Plant
Electrical and I & C InstallationCarrying out deliveries and assembly works in the I&C industry for BASF Schwarzheide GmbH
Conventional power generation, Electrical and I & C InstallationInstallation of a new inverter for the main condensate pump, Opole Power Plant
Conventional power generation, Electrical and I & C InstallationDelivery of electric motors for mills and mill fans, Opole Power Plant
Electrical and I & C Installation, Gas power generation Installation of I&C systems and elements of the HDCS system along with the delivery of material Czechnica CHP Plant, Siechnica
Electrical and I & C InstallationComprehensive installation including the supply of instrumentation, cables, and I&C equipment , Dolna Odra Power Plant , Nowe Czarnowo
Gas power generation, General contractingConstruction of a gas-fueled cogeneration source based on a set of gas engines with a power of up to 50 MWe, Gdynia CHP Plant
Electrical and I & C InstallationImplementation of works related to the connection of group recipients in Opole