June 12, 2024Installation of a gas boiler with auxiliary devices, Żerań CHP plant in WarsawFull-scope erection of gas-fired heat recovery boiler with its auxiliary equipment at Żerań CHP Plant in Warsaw.Read more
June 12, 2024Complete assembly and pre-assembly of the steel structure of external channels, Turów Power Plant, BogatyniaFull-scope assembly and erection of steel structure for external ductwork under the project: “Construction [...]Read more
June 12, 2024Modernization of the inlet to the FGD absorber, Pątnów II Power Plant, KoninLining the bottom of the absorber stub with corrosion-resistant material ALOY 59 and installing a sediment [...]Read more