June 12, 2024Installation of a gas boiler with auxiliary devices, Żerań CHP plant in WarsawFull-scope erection of gas-fired heat recovery boiler with its auxiliary equipment at Żerań CHP Plant in Warsaw.Read more
June 12, 2024Protection of K-7 boiler pressure part against corrosion, Siekierki CHP Plant, WarsawProtection of K-7 boiler pressure part against corrosion at Siekierki CHP Plant.Read more
June 12, 2024Complete assembly and pre-assembly of the steel structure of external channels, Turów Power Plant, BogatyniaFull-scope assembly and erection of steel structure for external ductwork under the project: “Construction [...]Read more
June 12, 2024Modernization of the inlet to the FGD absorber, Pątnów II Power Plant, KoninLining the bottom of the absorber stub with corrosion-resistant material ALOY 59 and installing a sediment [...]Read more
June 12, 2024Medium overhaul of OP-380 boiler no. 6 in scope of the pressure part, Łagisza Power Plant, BędzinMedium overhaul of OP-380 boiler no. 6 in scope of the pressure part.Read more
May 10, 2024Boiler adaptation to biomass cofiring, Wrocław CHP PlantAdaptation of OP-430 K2 boiler to biomass cofiring, Wrocław CHP PlantRead more
May 10, 2024Connection of unit no. 5 to existing FGD instalation at Łagisza Power Plant, BędzinConnection of unit no. 5 to existing FGD instalation at Łagisza Power Plant, Będzin.Read more
May 9, 2024Modernization of the urea injection system (SNCR) for units 1-3, Turów Power Plant.Modernisation of the CFB-670 boilers on units 1-3 and modernisation of the urea injection system (SNCR)- [...]Read more
May 1, 2024GAWO Installation, Fiddlers Ferry Power Station, Warrington, UKExecution of GAWO installation and additional assembly works in England.Read more