electrical
July 23, 2024
Comprehensive assembly and delivery of equipment, cables and I&C equipment, Dolna Odra Power Plant, Nowe Czarnowo
Installation and delivery of materials and instrumentation equipment for the installation of the Gas and [...]
Read moreJuly 23, 2024
Design, delivery and assembly of complete drive systems for air and exhaust gas fans for unit No. 4, Połaniec Power Plant
Design, delivery and assembly of complete drive systems for air and exhaust fans for Unit no. 4, including: [...]
Read moreJune 13, 2024
Installation of a new inverter for the main condensate pump, Opole Power Plant
The subject of the order was the installation of a new inverter for the main condensate pump 06LCB11AP001 [...]
Read moreJune 13, 2024
Delivery of electric motors for mills and mill fans, Opole Power Plant
The scope of the project included: 1. Preparation of documentation for the installation and connection of [...]
Read moreJune 13, 2024
Installation of I&C systems and elements of the HDCS system along with the delivery of material Czechnica CHP Plant, iechnica
Installation and delivery of materials and instrumentation equipment necessary to connect instrumentation [...]
Read moreJune 12, 2024
Implementation of works related to the connection of group recipients. IV and V in Opole
Implementation of works related to the connection of group recipients. IV and V in the area of operations [...]
Read moreJune 12, 2024
Installation and commissioning of I&C devices, BASF factory in Środa Śląska
Installation and start-up of I&C equipment associated with extension of BASF factory in Środa Śląska. [...]
Read moreJune 12, 2024
Installation of I&C in the scope of ECS for the construction of Units 5 and 6, Opole Power Plant
Installation works of I&C part in scope of ECS for construction of power units 5 & 6 at Opole Power [...]
Read moreJune 1, 2024
Installation of I&C systems and UDCS system elements along with the implementation of materials in CHP Czechnica Plant, Siechnica
Installation and delivery of materials and instrumentation equipment necessary to connect instrumentation [...]
Read moreMay 9, 2024
Modernization works of a system at BASF Catalyst Production Plant in Środa Śląska
Modernization works of a system at BASF Catalyst Production Plant in Środa Śląska
Read moreMay 9, 2024
Installation work – FGD, SCR, Siekierki CHP Plant Warsaw
Installation work (EI&C) – Siekierki CHP Plant – FGD SCR K2.
Read moreMay 9, 2024
Modifications in pumps drives for power units 3 and 4, Opole Power Plant
Modifications in PX1 pumps drives for power units 3 and 4 in Opole Power Plant.
Read moreMay 9, 2024
EI&C works at Nutricia Polska Sp. z o.o., Opole
Execution of works in low voltage scope under EI&C part at Nutricia Polska Sp. z o.o. in Opole
Read moreMay 9, 2024
Retrofit of AP4 turbine generator unit – Legnica CHP Plant
System and I&C works under retrofit of AP4 turbine generator unit installed at EC 4 Dept. in Legnica.
Read moreMay 9, 2024
EI&C Works – Nutricia Production Plant, Opole
Execution of works under EI&C part at Nutricia Production Plant, Opole
Read moreMay 9, 2024
Installation works for cooling line in Pudliszki
Delivery of materials and installation works for ketchup cooling line in Pudliszki.
Read moreMay 9, 2024
I&C installation works and start-up of biomass feeding system to boiler no. 2. – Opole Power Plant
Execution of I&C installation works and start-up of biomass feeding system to boiler no. 2 – [...]
Read moreMay 9, 2024
Alteration of a power system of the old Konstancin-Jeziorna WWTP
Alteration of a power system of the old Konstancin-Jeziorna WWTP from 6kV supply to 15kV supply in PGE grid.
Read moreMay 9, 2024
Installation of EI&C part at biomass system – Szczecin CHP Plant
Installation of EI&C part at biomass system at Szczecin CHP Plant
Read more