Electrical and I & C Installation, Gas power generationComprehensive assembly and delivery of equipment, cables and I&C equipment, Dolna Odra Power Plant, Nowe Czarnowo
Conventional power generation, Electrical and I & C InstallationDesign, delivery and assembly of complete drive systems for air and exhaust gas fans for unit No. 4, Połaniec Power Plant
Electrical and I & C InstallationCarrying out deliveries and assembly works in the I&C industry for BASF Schwarzheide GmbH
Conventional power generation, Electrical and I & C InstallationInstallation of a new inverter for the main condensate pump, Opole Power Plant
Conventional power generation, Electrical and I & C InstallationDelivery of electric motors for mills and mill fans, Opole Power Plant
Electrical and I & C Installation, Gas power generation Installation of I&C systems and elements of the HDCS system along with the delivery of material Czechnica CHP Plant, Siechnica
Electrical and I & C InstallationComprehensive installation including the supply of instrumentation, cables, and I&C equipment , Dolna Odra Power Plant , Nowe Czarnowo
Electrical and I & C InstallationImplementation of works related to the connection of group recipients in Opole
Electrical and I & C InstallationConstruction of a 15kV cable line with telecommunication sewage, Odra Cement Plant, Opole
Electrical and I & C InstallationDelivery and installation of I&C industry components as part of the project: “Ohly Sahara”, Germany
Conventional power generation, Electrical and I & C InstallationAdaptation of emission monitoring systems on units 1-6 BAT requirements regarding equipment for measuring Hg, NH3, HCl and HF in waste gases, Opole Power Plant
Electrical and I & C Installation, General contractingGeneral contracting for the ventilation area, Połaniec Power Plant, Zawada
Electrical and I & C InstallationDismantling and assembly works as part of the DCS system migration, Gdańsk CHP Plant
Electrical and I & C InstallationInstallation and commissioning of I&C devices, BASF factory in Środa Śląska
Conventional power generation, Electrical and I & C InstallationInstallation of I&C in the scope of ECS for the construction of Units 5 and 6, Opole Power Plant
Conventional power generation, Electrical and I & C InstallationCommissioning tests for newly designed power units 5 and 6 (2x900MW), Opole Power Plant
Electrical and I & C Installation, Gas power generationInstallation of I&C systems and UDCS system elements along with the implementation of materials at CHP Czechnica Plant, Siechnica
Electrical and I & C InstallationDelivery and installation of the grounding and equipotential installation of turbine sets Bl 5 and 6, Opole Power Plant
Electrical and I & C InstallationElectrical works as part of the construction of power units, Opole Power Plant
Electrical and I & C InstallationParticipation in the expansion of the Volkswagen GmbH factory in the electrical and I&C industry, Września
Electrical and I & C InstallationEI&C works – Commissioning of Baghouse Filter for New Boiler, Fortum Zabrze CHP Plant