General contracting
- 2022
Development of high-efficiency cogeneration through the construction of a biomass boiler unit at the Łąkowa CHP plant in Grudziądz
- 2021
Construction of a gas boiler house with a capacity of 5x32 MWt at PGE EC S.A. CHP in Kielce
- 2021
Construction of a high-efficiency trigeneration unit with a total nominal electric power up to 1.0 MW - Promet-Plast s.c. Elżbieta and Andrzej Jeżewscy, Oława
- 2020
Execution of the flue gas denitrification installation - unit 71MW at JSW KOKS S.A.Przyjaźń Branch in Dąbrowa Górnicza. "
- 2020
Installation of the Flue Gas Treatment Plant for WR-25 boilers at Heat plant „Północ” and Heat Plant „Południe” as part of the project entitled "Adaptation of heat sources to the requirements of BAT Conclusions" at RADPEC S.A. "
- 2019
Installation of environment protection systems at KFA and KFB boilers in Żerań CHP Plant to meet concentration requirements in line with BAT conclusions.
- 2019
Providing a service consisting in technical supervision during repowering of power units no. 1 and 3 at PGE GiEK S.A. Turów Power Plant.
- 2018
Alteration of boiler no. 4 at Synthos Dwory 7 to adapt it to gaseous fuel.
- 2018
Construction of peak load back-up boiler house in TAURON Wytwarzanie S.A. Łagisza Power Plant.
- 2018
Construction of FGD Plant at Łąkowa II Heat Generating Plant - OPEC INEKO Sp. Z o.o.
- 2018
Delivery and Installation of SCR DeNOx systems for OP-650 boilers at units no. 5, 6, 7, 8 in Dolna Odra Power Plant
- 2018
NOx emission reduction below 150 mg/Nm3 at power units no. 1, 2 and 4 in PGE GiEK S.A at Opole Power Plant.
- 2018
Retrofit of OP-230/K-1 boiler in scope of NOx reduction systems installed at ZEW Kogeneracja S.A. Wrocław CHP Plant.
- 2017
DeNOx system with SCR method to reduce NOx concentration in flue gas below 150 mg/Nm3 at CEZ Skawina Power Plant
- 2017
Construction of SCR DeNOx system for two OP-230 boilers at Bydgoszcz CHP Plant.
- 2016
NOx emission reduction below 150 mg/Nm3 at power unit no. 3 with non-catalytic method at PGE GiEK S.A at Opole Power Plant.
- 2016
SNCR technology for boilers K14, K15, K16, K17, K18 and K19 at Unipetrol Litvinov Power Plant.
- 2015
Retrofit of boilers: OP140 (1K2), OP430 (2K & 3K) at Karolin CHP Plant of Veolia Energia Poznań ZEC S.A. for NOx emission reduction.
- 2015
Design, manufacturing and installation of primary measures and SNCR systems for two BC-50 boilers at EDF Polska S.A. - Wybrzeże CHP Plant in Gdynia.
- 2015
Construction of DeNOx system for WP-70 boiler no. 5 at Zofiówka CHP Plant
- 2014
Delivery and installation of the system to reduce nitrogen oxides emission at power units no. 4, 5 and 6 at Turów Power Plant.
- 2013
Retrofit of lignite powder fired boilers type OP650b on a "turnkey" basis at power units no. 1, 2 at Pątnów I Power Plant to reduce NOx emission level below 200 mg/Nm3.
- 2013
NOx emission reduction below 200 mg/Nm3 at units 1, 2 and 4. at Opole Power Plant
- 2012
Supply and installation of the NOx reduction system at power units no. 1, 2 and 3 in Turów Power Plant.
- 2012
Installation of SNCR system at OP-230/K1 boiler at Wrocław CHP Plant
- 2010
Retrofit of K5 boiler at Pątnów Power Plant to reduce NOx emission.
- 2010
Execution of biomass system for boilers K3 and K9 at Łódź CHP Plant
- 2010
Extension of Gas fired CHP Plant in Siedlce.
- 2010
Design and deliveries for biomass systemat Stalowa Wola Power Plant
- 2022
Development of high-efficiency cogeneration through the construction of a biomass boiler unit at the Łąkowa CHP plant in Grudziądz
- 2021
Construction of a gas boiler house with a capacity of 5x32 MWt at PGE EC S.A. CHP in Kielce
- 2021
Construction of a high-efficiency trigeneration unit with a total nominal electric power up to 1.0 MW - Promet-Plast s.c. Elżbieta and Andrzej Jeżewscy, Oława
- 2020
Execution of the flue gas denitrification installation - unit 71MW at JSW KOKS S.A.Przyjaźń Branch in Dąbrowa Górnicza. "
- 2020
Installation of the Flue Gas Treatment Plant for WR-25 boilers at Heat plant „Północ” and Heat Plant „Południe” as part of the project entitled "Adaptation of heat sources to the requirements of BAT Conclusions" at RADPEC S.A. "
- 2019
Installation of environment protection systems at KFA and KFB boilers in Żerań CHP Plant to meet concentration requirements in line with BAT conclusions.
- 2019
Providing a service consisting in technical supervision during repowering of power units no. 1 and 3 at PGE GiEK S.A. Turów Power Plant.
- 2019
Follow-up measurements of flue gas temperature at WP-70 boiler for future installation of the DeNOx system at Zofówka CHP Plant.
- 2018
Alteration of boiler no. 4 at Synthos Dwory 7 to adapt it to gaseous fuel.
- 2018
Construction of peak load back-up boiler house in TAURON Wytwarzanie S.A. Łagisza Power Plant.
- 2018
Construction of FGD Plant at Łąkowa II Heat Generating Plant - OPEC INEKO Sp. Z o.o.
- 2018
Delivery and Installation of SCR DeNOx systems for OP-650 boilers at units no. 5, 6, 7, 8 in Dolna Odra Power Plant
- 2018
Measurements of air “cold” distribution above the grate of WP-25 boiler no. 3 with technical opinion on a method of its retrofit at Energetyka Cieplna Opolszcyzny S.A
- 2018
NOx emission reduction below 150 mg/Nm3 at power units no. 1, 2 and 4 in PGE GiEK S.A at Opole Power Plant.
- 2018
Stocktaking, diagnostic testing and optimization of a process system of boiler no. 9 at Synthos Dwory 7.
- 2018
Retrofit of OP-230/K-1 boiler in scope of NOx reduction systems installed at ZEW Kogeneracja S.A. Wrocław CHP Plant.
- 2018
Preparation of feasibility study regarding retrofit of WP-70 boiler no. 5 in terms of increasing its Maximum Continuous Rating (MCR) when firing pulverized hard coal at Będzin CHP Plant
- 2017
DeNOx system with SCR method to reduce NOx concentration in flue gas below 150 mg/Nm3 at CEZ Skawina Power Plant
- 2017
Optimization of combustion process and Rotamix system of OP230/K-1 boiler at Wrocław CHP Plant in order to reach required NOx emission values.
- 2017
Construction of SCR DeNOx system for two OP-230 boilers at Bydgoszcz CHP Plant.
- 2017
Coordination of repowering of power unit no. 2 at PGE GiEK S.A. at Turów Power Plant
- 2016
NOx emission reduction below 150 mg/Nm3 at power unit no. 3 with non-catalytic method at PGE GiEK S.A at Opole Power Plant.
- 2016
SNCR technology for boilers K14, K15, K16, K17, K18 and K19 at Unipetrol Litvinov Power Plant.
- 2015
Retrofit of boilers: OP140 (1K2), OP430 (2K & 3K) at Karolin CHP Plant of Veolia Energia Poznań ZEC S.A. for NOx emission reduction.
- 2015
Design, manufacturing and installation of primary measures and SNCR systems for two BC-50 boilers at EDF Polska S.A. - Wybrzeże CHP Plant in Gdynia.
- 2015
Construction of DeNOx system for WP-70 boiler no. 5 at Zofiówka CHP Plant
- 2015
Position of commissioning coordinator for units no. 1 and 2. at Pątnów -Adamów-Konin Power Plant.
- 2014
Construction of FGD Plant and DeNOx system at Będzin CHP Plant
- 2014
Development of a design for works associated with dismantling of the system at Pigna CHP Plant and its relocation to Karolin CHP Plant.
- 2014
Delivery and installation of the system to reduce nitrogen oxides emission at power units no. 4, 5 and 6 at Turów Power Plant.
- 2013
Retrofit of lignite powder fired boilers type OP650b on a "turnkey" basis at power units no. 1, 2 at Pątnów I Power Plant to reduce NOx emission level below 200 mg/Nm3.
- 2013
Application of corrosion protection coatings on evaporators of steam boilers at EDF Polska Group (Gdynia, ZEW Kogeneracja, EDF Kraków)
- 2013
Application of protective coating - HybridMD at furnace chambers of OP-430 boilers no. K-14 and K-15 at Siekierki CHP Plant
- 2013
Application of corrosion protection coating at evaporator of boiler K-1 at Kraków CHP Plant.
- 2013
NOx emission reduction below 200 mg/Nm3 at units 1, 2 and 4. at Opole Power Plant
- 2012
Repair of Hybrid MD coating at OP430 K7 boiler in Łódź CHP Plant (EC-4).
- 2012
Application of Hybrid DGL coating at evaporator of OP-430/K-2 boiler in Wrocław CHP Plant.
- 2012
Supply and installation of the NOx reduction system at power units no. 1, 2 and 3 in Turów Power Plant.
- 2012
Application of Hybrid Bio protective coating on waterwalls of boiler no. 1 at Połaniec Power Plant
- 2012
Application of a composite layer at evaporator of boiler K-4 at Kraków CHP Plant.
- 2012
Provision of engineers for preparation of a proposal for construction of supercritical power unit at Kozienice Power Plant.
- 2012
Installation of SNCR system at OP-230/K1 boiler at Wrocław CHP Plant
- 2010
Retrofit of K5 boiler at Pątnów Power Plant to reduce NOx emission.
- 2010
Execution of biomass system for boilers K3 and K9 at Łódź CHP Plant
- 2010
Scientific and research work for Energa Ostrołeka Power Plant
- 2010
Extension of Gas fired CHP Plant in Siedlce.
- 2010
Design and deliveries for biomass systemat Stalowa Wola Power Plant
Electrical and I & C Installation
- 2021
“Modernization of BMS on boilers K1-K7 in CHP Plant/PKN ORLEN S.A
- 2018
Retrofit of electrostatic precipitators at power units 1-4 – adaptation to BAT conclusions at PGE GiEK S.A. Opole Power Plant Branch.
- 2018
Installation works of I&C part in scope of ECS for construction of power units 5 & 6 at PGE GiEK S.A., Opole Power Plant.
- 2018
Delivery, installation and start-up of I&C equipment at Środa Śląska BASF factory
- 2017
Commissioning tests for newly designed power units 5 and 6 (2x900MW) at PGE GiEK S.A., Opole Power Plant
- 2016
Retrofit works of a system at Środa Śląska BASF Factory
- 2016
Installation work of the central part of the DCS and I&C scope at PGE GiEK S.A., Opole Power Plant
- 2015
Design work for 6 MWe generator at PCC Rokita, Brzeg Dolny CHP Plant.
- 2015
Modifications in drives of PX1 pumps for power units 3 and 4 at PGE GiEK S.A., Opole Power Plant
- 2013
Control system and installation of I&C part for Catalyst Production Plant at Środa Sląska BASF factory
- 2012
I&C commissioning work at LMG Lubiatów project.
- 2012
Alteration of a power system of the old Konstancin-Jeziorna Waste Water Treatment Plant from 6kV supply to 15kV supply in PGE grid.
- 2009
Works under I&C part at ICI Pilawa.
- 2006
Participation of electric specialists in commissioning works at Moneypoint, Ireland.
- 2021
“Modernization of BMS on boilers K1-K7 in CHP Plant/PKN ORLEN S.A
- 2019
Dismantling and erection works under the project task - DCS migration at power units no. 2 and no. 5 at Gdańsk CHP Plant.
- 2018
Repair of turbine generator unit in EI&C scope at Legnica CHP Plant (EC-4)
- 2018
Retrofit of electrostatic precipitators at power units 1-4 – adaptation to BAT conclusions at PGE GiEK S.A. Opole Power Plant Branch.
- 2018
Installation works of I&C part in scope of ECS for construction of power units 5 & 6 at PGE GiEK S.A., Opole Power Plant.
- 2018
Delivery, installation and start-up of I&C equipment at Środa Śląska BASF factory
- 2018
Installation of secondary automatic connections - power units 5 & 6 and BOP systems at PGE GiEK S.A., Opole Power Plant
- 2017
Commissioning tests for newly designed power units 5 and 6 (2x900MW) at PGE GiEK S.A., Opole Power Plant
- 2016
Execution of EI&C work under the task “Start-up of Baghouse Filter for New Boiler System at Fortum Zabrze CHP Plant
- 2016
Retrofit works of a system at Środa Śląska BASF Factory
- 2016
Installation work of the central part of the DCS and I&C scope at PGE GiEK S.A., Opole Power Plant
- 2016
Delivery and installation of earthing and equipotential bonding system for turbine generator unit of power units 5 & 6 - Q42.1, at PGE GiEK S.A., Opole Power Plant
- 2016
Engineering supervision in a new VW production plant in Września.
- 2016
Installation work (EI&C) -FGD SCR K2 at Siekierki CHP Plant
- 2015
Design work for 6 MWe generator at PCC Rokita, Brzeg Dolny CHP Plant.
- 2015
Delivery and start-up of ATS/PTS automation at 6 kV switching station RR-2, at PGE GiEK S.A., Opole Power Plant
- 2015
Lighting and plug-in socket system in 5UHA and 6UHA buildings under construction of power units at PGE GiEK S.A, Opole Power Plant.
- 2015
Dismantling and installation of EI&C part at vegetable conveying line in Nutricia. Dismantling of existing drives, relocation of equipment and re-installation. Delivery of cables and replacement of cable routes at NUTRICIA Polska S.A.
- 2015
Modifications in drives of PX1 pumps for power units 3 and 4 at PGE GiEK S.A., Opole Power Plant
- 2015
Execution works under I&C part repairs of the turbine generator unit (TG-2) at Legnica CHP Plant (EC-4)
- 2013
System and I&C works under retrofit of AP4 turbine generator unit installed at EC 4 Dept. in Legnica.
- 2013
Delivery of materials and installation works for ketchup cooling line in Pudliszki.
- 2013
Provision of Automation System Supervising Inspector at Łódź CHP Plant (EC-4).
- 2013
Control system and installation of I&C part for Catalyst Production Plant at Środa Sląska BASF factory
- 2013
Execution of works under EI&C part at Nutricua Polska Sp. Z o.o. Production Plant
- 2012
I&C installation work at a biomass-fired unit at Elbląg CHP Plant
- 2012
Execution of works under I&C part at Elbląg CHP Plant.
- 2012
I&C commissioning work at LMG Lubiatów project.
- 2012
Alteration of a power system of the old Konstancin-Jeziorna Waste Water Treatment Plant from 6kV supply to 15kV supply in PGE grid.
- 2011
Execution of I&C installation works and start-up of biomass feeding system to boiler no. 2. at PGE GiEK S.A., Opole Power Plant
- 2011
Execution of works in low voltage scope under EI&C part at NUTRICIA Polska Sp. z o.o. Productin Plant
- 2009
Delivery and installation of EI&C part at HJ Heinz Polska Sp. Z o.o., Pudliszki.
- 2009
Installation works of EI&C part for Pouring Line, France.
- 2009
Modifications in control and protection system of OP-230 boiler no. K1 at Kogeneracja S.A, Wrocław CHP Plant
- 2009
Installation works of EI&C part in Dulux, Pilawa.
- 2009
Works under I&C part at ICI Pilawa.
- 2009
Deliveries and installation of electric part of CCPP at Arctic Paper S.A.
- 2007
Execution of works under EI&C part of the rehabilitation system at PGE GiEK S.A., Turów Power Plant
- 2006
Participation of electric specialists in commissioning works at Moneypoint, Ireland.
Mechanical erection
- 2020
Protection of K-7 boiler pressure part against corrosion at Siekierki CHP Plant.
- 2018
Full-scope erection of gas-fired heat recovery boiler with its auxiliary equipment at Żerań CHP Plant in Warsaw.
- 2018
Full-scope delivery and application of Hybrid Complex coating on a front waterwall of the furnace chamber - OP-650 boiler no. K-1 - at Energa Elektrownia Ostrołęka S.A.
- 2018
Application of a test coating type Hybrid DGL+CER and Hybrid CER on boiler tubes in HMG II heat recovery boiler at KGHM Polska Miedź S.A.
- 2018
Full-scope assembly and erection of steel structure for external ductwork under the project: “Construction of New Power Unit in Turów Power Plant”.
- 2017
Repowering of CFB-670 boilers at units 1-3 in PGE GiEK S.A. Oddział Elektrownia Turów – retrofit of urea injection system (SNCR) - Turów K2 Project.
- 2017
Application of hybrid coatings at Inowrocław Plant / Ciech Soda Polska S.A.
- 2017
Erection of cold and hot air ducts under construction of new 450MW power unit at Turów Power Plant in Bogatynia.
- 2017
Full-scope application of ceramic coating on waterwall tubes of boiler no. 4. at TAURON Wytwarzanie S.A. Jaworzno Power Plant
- 2016
Retrofit of flue gas inlet port of FGDP absorber at Pątnów II Power Plant
- 2016
Transport, retrofit and installation with start-up of testing facilities, i.e. auto-thermal reactor and concentrating solar collector at Wrocław University of Science and Technology
- 2015
Dismantling and installation work of DeNOx system at Siekierki CHP Plant
- 2013
Repowering and general overhaul of Op-650k boiler at unit no. 10 in TAURON Wytwarzanie Spółka Akcyjna - Oddział Elektrownia Łaziska.
- 2013
Retrofit of the pressure part of unit no. 6 at Tauron Wytwarzanie S.A, Jaworzno III Power Plant
- 2013
Major overhaul and retrofit of OP-650 boiler no. 6 at Tauron Wytwarzanie S.A, Jaworzno III Power Plant
- 2012
Overhaul of pressure part of OP-380 boiler no. 6 at Tauron Wytwarzanie S.A., Łagisza Power Plant
- 2012
Retrofit of OP-430 boiler no. K-15 at PGNiG Termika, Siekierki CHP Plant.
- 2012
Repairs of drum of OP-380 boiler at Tauron Wytwarzanie S.A., Łaziska Power Plant.
- 2012
Coordination of overhaul and retrofit of boiler no. 4. at Tauron Wytwarzanie S.A., Jaworzno III Power Plant
- 2011
Retrofit of OP-380 K-11 boiler at PGNiG Termika, Siekierki CHP Plant
- 2011
Execution of the third line of biomass system at Wrocław CHP Plant
- 2010
Erection works for four heat recovery boilers at KGHM Polska Miedź S.A., Głogów Plant
- 2010
Extension of slag handling system - execution of process systems at PGNiG Termika, Żerań CHP Plant
- 2010
Participation in overhaul of AP-1650 boiler at unit no. 10 at ENEA Wytwarzanie, Kozienice Power Plant
- 2010
Erection/installation works at unit D at Neurath Power Plant, Germany
- 2009
General Coordinator of FGD Plant construction at PGE GiEK S.A, Dolna Odra Power Plant
- 2009
Erection of pipelines at PCC Rokita S.A., Brzeg Dolny CHP Plant (EC-3).
- 2009
Deliveries and erection of mechanical part of CCPP at APK2 Poznań Arctic Paper S.A.
- 2009
Medium overhaul of OP-380 boiler no. 6 in scope of the pressure part at Tauron Wytwarzanie S.A., Łagisza Power Plant
- 2008
NOx emission reduction at boiler no. 3 at PGE GiEK S.A., Opole Power Plant
- 2008
Erection of GAVO and additional erection works at Fiddler's Ferry Power Station, England.
- 2008
Delivery and installation of paraffin storage tank at Kronospan Sp. Z o.o.
- 2008
Welding and erection works for structure and silos of biomass at Rybnik Power Plant
- 2008
Adaptation of OP-430 K2 boiler to biomass cofiring at Kogeneracja S.A, Wrocław CHP Plant
- 2007
Cooling system for circulation water - “W” route at Coke Derivatives departmentm, Zdzieszowice Coke Plant.
- 2007
Connection of unit no. 5 to existing FGD Plant at Tauron Wytwarzanie S.A., Łagisza Power Plant.
- 2020
Protection of K-7 boiler pressure part against corrosion at Siekierki CHP Plant.
- 2018
Full-scope erection of gas-fired heat recovery boiler with its auxiliary equipment at Żerań CHP Plant in Warsaw.
- 2018
Full-scope delivery and application of Hybrid Complex coating on a front waterwall of the furnace chamber - OP-650 boiler no. K-1 - at Energa Elektrownia Ostrołęka S.A.
- 2018
Application of a test coating type Hybrid DGL+CER and Hybrid CER on boiler tubes in HMG II heat recovery boiler at KGHM Polska Miedź S.A.
- 2018
Full-scope assembly and erection of steel structure for external ductwork under the project: “Construction of New Power Unit in Turów Power Plant”.
- 2018
Pre-assembly of Lubeco preheater casing at Turów Power Plant
- 2017
Repowering of CFB-670 boilers at units 1-3 in PGE GiEK S.A. Oddział Elektrownia Turów – retrofit of urea injection system (SNCR) - Turów K2 Project.
- 2017
Application of hybrid coatings at Inowrocław Plant / Ciech Soda Polska S.A.
- 2017
Erection of cold and hot air ducts under construction of new 450MW power unit at Turów Power Plant in Bogatynia.
- 2017
Full-scope application of ceramic coating on waterwall tubes of boiler no. 4. at TAURON Wytwarzanie S.A. Jaworzno Power Plant
- 2016
Retrofit of flue gas inlet port of FGDP absorber at Pątnów II Power Plant
- 2016
Transport, retrofit and installation with start-up of testing facilities, i.e. auto-thermal reactor and concentrating solar collector at Wrocław University of Science and Technology
- 2015
Dismantling and installation work of DeNOx system at Siekierki CHP Plant
- 2013
Repowering and general overhaul of Op-650k boiler at unit no. 10 in TAURON Wytwarzanie Spółka Akcyjna - Oddział Elektrownia Łaziska.
- 2013
Retrofit of the pressure part of unit no. 6 at Tauron Wytwarzanie S.A, Jaworzno III Power Plant
- 2013
Major overhaul and retrofit of OP-650 boiler no. 6 at Tauron Wytwarzanie S.A, Jaworzno III Power Plant
- 2012
Overhaul of pressure part of OP-380 boiler no. 6 at Tauron Wytwarzanie S.A., Łagisza Power Plant
- 2012
Dismantling and erection of flue gas ducts under overhaul of OP-430 boiler no. K-1. at PGNiG Termika, Siekierki CHP Plant
- 2012
Modification of low-NOx burners with accessories of OP-380 boiler no. 1 to adapt them to fire biomass at PGE Energia Ciepła, Kraków CHP Plant
- 2012
Retrofit of OP-430 boiler no. K-15 at PGNiG Termika, Siekierki CHP Plant.
- 2012
Repairs of drum of OP-380 boiler at Tauron Wytwarzanie S.A., Łaziska Power Plant.
- 2012
Coordination of overhaul and retrofit of boiler no. 4. at Tauron Wytwarzanie S.A., Jaworzno III Power Plant
- 2012
Replacement of tanks Z1 and Z2 at Łódź CHP Plant
- 2011
Overhaul of superheaters at OP -230 boiler no. 4 at PGNiG Termika, Żerań CHP Plant
- 2011
Erection/installation works under construction of SCR DeNOx systems at PGNiG Termika, Siekierki CHP Plant
- 2011
Retrofit of OP-380 K-11 boiler at PGNiG Termika, Siekierki CHP Plant
- 2011
Execution of the third line of biomass system at Wrocław CHP Plant
- 2011
Overhaul of slag handling equipment at Wrocław CHP Plant
- 2011
Supervising inspector for erection of terephthalic acid production pipelines at ORLEN S.A., Włocławek PTA Plant.
- 2011
Retrofit of air preheater at OP-230 boiler no. K5 at PGNig Termika, Żerań CHP Plant
- 2010
Erection works for four heat recovery boilers at KGHM Polska Miedź S.A., Głogów Plant
- 2010
Extension of slag handling system - execution of process systems at PGNiG Termika, Żerań CHP Plant
- 2010
Participation in overhaul of AP-1650 boiler at unit no. 10 at ENEA Wytwarzanie, Kozienice Power Plant
- 2010
Erection/installation works at unit D at Neurath Power Plant, Germany
- 2010
Erection works for biomass system at Skawina Power Plant
- 2010
Erection works at unit A at Neurath Power Plant, Germany
- 2010
Erection works of biomass gasification process line at MZEC Świdnica Sp. Z o.o
- 2010
Erection/installation works for reconstruction of a filter at K-1 biomass system at Kogeneracja S.A, Wrocław CHP Plant
- 2010
Dismantling and erection works during retrofit of ESP at unit no. 1 at PGE GiEK S.A., Opole Power Plant
- 2009
General Coordinator of FGD Plant construction at PGE GiEK S.A, Dolna Odra Power Plant
- 2009
Erection of pipelines at PCC Rokita S.A., Brzeg Dolny CHP Plant (EC-3).
- 2009
Deliveries and erection of mechanical part of CCPP at APK2 Poznań Arctic Paper S.A.
- 2009
Medium overhaul of OP-380 boiler no. 6 in scope of the pressure part at Tauron Wytwarzanie S.A., Łagisza Power Plant
- 2009
Retrofit of silencers at OP -140 boilers no. 6 and 7 at Będzin CHP Plant
- 2009
Adaptation of a coal silo to pellet silo at PGE GiEK S.A., Opole Power Plant.
- 2009
Capitalized overhaul of baghouse filters at Kogeneracja S.A., Czechnica CHP Plant
- 2009
Overhaul of pulverizing unit of boiler no. 3 at Legica CHP Plant (EC-4)
- 2008
NOx emission reduction at boiler no. 3 at PGE GiEK S.A., Opole Power Plant
- 2008
Erection of GAVO and additional erection works at Fiddler's Ferry Power Station, England.
- 2008
Delivery and installation of paraffin storage tank at Kronospan Sp. Z o.o.
- 2008
Welding and erection works for structure and silos of biomass at Rybnik Power Plant
- 2008
Adaptation of OP-430 K2 boiler to biomass cofiring at Kogeneracja S.A, Wrocław CHP Plant
- 2007
Cooling system for circulation water - “W” route at Coke Derivatives departmentm, Zdzieszowice Coke Plant.
- 2007
Connection of unit no. 5 to existing FGD Plant at Tauron Wytwarzanie S.A., Łagisza Power Plant.
Commissioning
- 2020
Providing services associated with CCPP commissioning at Żerań CHP Plant.
- 2020
Participation of SBB Energy S.A. engineers in commissioning works on site at thermal waste neutralization plant, Vilnius, Lithuania.
- 2020
Participation in commissioning of MHPSE boiler at Turów Power Plant.
- 2019
Construction of the power unit based on coal fuel at Grupa Azoty Puławy
- 2019
Participation of SBB Energy S.A. engineers in commissioning works on SMG1 at thermal waste neutralization plant, San Sebastian Project,Spain.
- 2019
Participation of SBB Energy S.A. engineers in commissioning works on site at EON Värme Sverige AB, Högbytorp, Sweden.
- 2019
Participation in commissioning works on Chongqing project at Chongquing Power Plant, China.
- 2018
Supervision and commissioning works at Turów Power Plant.
- 2018
Commissioning of 910 MW power unit at Tauron Jaworzno III Power Plant – Power Plant II.
- 2018
Commissioning of CHPP at Stalowa Wola CHP Plant
- 2018
Coordination of commissioning of 910MW supercritical power unit at TAURON sp. z o.o., Jaworzno Power Plant
- 2018
Participation in commissioning works at Galing Power & Energy Construction Co. Inc, Cebu, Philippines
- 2018
Participation of SBB Energy S.A. commissioning engineer at Soma Colin project, Turkey.
- 2018
Supporting services for operation of CFB-275 unit at Zofiówka CHP Plant.
- 2018
Commissioning works at CCPP in KGHM Copper Smelter, Głogów.
- 2018
Participation in commissioning in Pohang Power Station, South Korea
- 2018
Commissioning coordination with checking of all boiler systems before commissioning of a task: “Repowering of CFB-670 boiler at unit no. 2 at Turów Power Plant”.
- 2017
Process commissioning of power units 5 & 6 (2x900MW) at PGE GiEK S.A., Opole Power Plant
- 2017
Providing services in scope of support in process commissioning of power units 5 & 6 - 2x900MW at PGE GiEK S.A., Opole Power Plant
- 2017
Provision of commissioning engineers at Bihraj Tower, Vietnam.
- 2017
Provision of commissioning operator at Narva Power Plant, Estonia.
- 2017
Commissioning coordination at PKN ORLEN S.A, Płock CHP Plant
- 2017
Hot commissioning works completion for DeNOx SNCR Technology – B4 at Chvaletice Power Plant.
- 2017
Commissioning works of the boiler at GE Enerji Endustri Ticaret ve Servis Anonim Sirket, Karabiga, Turkey.
- 2016
Commissioning of power unit system and equipment at ENEA Wytwarzanie S.A., Kozienice Power Plant
- 2016
Commissioning works at ENEA Kozienice Power Plant
- 2016
Commissioning coordination of unit equipment at Kozienice Power Plant
- 2016
Commissioning of CFB boiler with I&C part at Zofiówka CHP Plant.
- 2016
Chemical cleaning of boilers no. 4 and 5 at ENEA KOZIENICE Power Plant
- 2015
Full-scope commissioning and final tests at Tychy CHP Plant
- 2015
Commissioning of Municipal Thermal Waste Treatment Plant in Konin.
- 2015
Start-up of TG1 and TG2 turbine generator units at Pątnów Power Plant.
- 2015
Commissioning works - Ledvice, Czech Republic.
- 2014
Full-scope commissioning, test run and tuning run of retrofitted wet FGD Plants at Siekierki CHP Plant.
- 2014
Commissioning of coal handling system at Łódź CHP Plant (EC-3)
- 2014
Commissioning of all process equipment and systems of the power unit at Przyjaźń Coke Plant
- 2014
Commissioning of 21 Mwe turbine generator unit at Zgierz CHP Plant.
- 2014
Coordination of works during start-up of BC100 unit at Łódź CHP Plant (EC-4)
- 2013
Erection of temporary system for chemical cleaning of boiler at 600MW K6 unit at Šoštanj Power Plant, Slovenia.
- 2013
DeNOx system commissioning for OOG-420 boiler no. K7 at PKN Orlen S.A , Płock CHP Plant
- 2012
Commissioning of 20 MWe biomass-fired power unit at Elbląg CHP Plant
- 2012
Commissioning of combined cycle power units at Głogów and Polkowice CHP Plants.
- 2012
Full-scope commissioning of electricity generating system in Renewable Energy Source at Stalowa Wola CHP Plant.
- 2012
Commissioning of BC50 power unit at Bielsko-Biała CHP Plant (EC1).
- 2012
Commissioning of WR40 boiler and system at Tychy CHP Plant.
- 2012
Commissioning of turbine generator unit at Patnów Power Plant
- 2012
Coordination of biomass system commissioning at Konin Power Plant.
- 2011
Commissioning of FGD Plant at PGE GiEK S.A., Dolna Odra Power Plant
- 2010
Commissioning of FGD Plant for 858 MW unit PGE GiEK S.A., Bełchatów Power Plant
- 2010
Commissioning of wet FGD Plant at PGNiG Termika S.A., Siekeirki CHP Plant
- 2010
Participation in boiler commissioning at PGE GiEK S.A., Bełchatów Power Plant
- 2009
Commissioning of Water Treatment Plant PGE GiEK S.A., Bełchatów Power Plant
- 2009
Commissioning of CCPP at Artctic Paper S.A.
- 2008
Supervision of commissioning of BC-50 unit at Kogeneracja S.A., Wrocław CHP Plant.
- 2008
Participation in commissioning of boilers at Alumar Rafinery, Brazil.
- 2008
Chemical cleaning of WP-3 blast furnace at arcelor Mittal Poland
- 2007
Commissioning of 460 MW power unit at Tauron Wytwarzanie S.A., Łagisza Power Plant.
- 2006
“Turnkey” commissioning and start-up of boiler, FGD Plant and other works for 460 MW power unit (“A”) at Pątnów II Power Plant
- 2005
Participation in commissioning of turbine generator unit at Deva Power Plant, Romania.
- 2020
Providing services associated with CCPP commissioning at Żerań CHP Plant.
- 2020
Participation of SBB Energy S.A. engineers in commissioning works on site at thermal waste neutralization plant, Vilnius, Lithuania.
- 2020
Participation of SBB Energy S.A. specialists in commissioning works in Dangjin 2 Power Plant, South Korea.
- 2020
Participation in commissioning of MHPSE boiler at Turów Power Plant.
- 2020
Support in commissioning of boiler no. 3 at Turów Power Plant.
- 2020
Participation in commissioning of FGD Plant at Łaziska Power Plant.
- 2019
Construction of the power unit based on coal fuel at Grupa Azoty Puławy
- 2019
Full-scope commissioning works for the coal handling system under the task “Construction of Coal Handling System Structures of New Power Unit at PGE GiEK S.A. Turów Power Plant.
- 2019
Supervision of mechanical erection of FGD Plant at Ptolemaida new unit V, Greece.
- 2019
Participation of SBB Energy S.A. engineers in commissioning works on SMG1 at thermal waste neutralization plant, San Sebastian Project,Spain.
- 2019
Participation of SBB Energy S.A. engineers in commissioning works on site at EON Värme Sverige AB, Högbytorp, Sweden.
- 2019
Commissioning works and alkaline boilout and blowing of boiler at ZEVO Malesice thermal waste neutralization plant - Prague, Czechia
- 2019
Participation of operator in commissioning of t FGD Plant at Ugljevik Power Plant, Bosnia and Herzegovina.
- 2019
Participation in commissioning works on Chongqing project at Chongquing Power Plant, China.
- 2019
Participation in commissioning at OFC Consulting Limited, Kiev, Ukraine.
- 2019
Preservation with nitrogen of 910 boiler at Tauron Nowe Jaworzno Power Plant.
- 2018
Supervision and commissioning works at Turów Power Plant.
- 2018
Commissioning of 910 MW power unit at Tauron Jaworzno III Power Plant – Power Plant II.
- 2018
Commissioning of CHPP at Stalowa Wola CHP Plant
- 2018
Coordination of commissioning of 910MW supercritical power unit at TAURON sp. z o.o., Jaworzno Power Plant
- 2018
Preparation of detailed operation and maintenance manuals for selected systems of power units no. 5 & 6 and BOP at PGE GiEK S.A., Opole Power Plant.
- 2018
Participation in commissioning works at Galing Power & Energy Construction Co. Inc, Cebu, Philippines
- 2018
Commissioning service at ZEVO Malesice thermal waste neutralization plant, Prague, Czechia.
- 2018
Participation of SBB Energy S.A. commissioning engineer at Soma Colin project, Turkey.
- 2018
Supporting services for operation of CFB-275 unit at Zofiówka CHP Plant.
- 2018
Commissioning works at CCPP in KGHM Copper Smelter, Głogów.
- 2018
Participation in commissioning in Pohang Power Station, South Korea
- 2018
Blowing process of high pressure pipeline at KGHM Copper Smelter, Głogów
- 2018
Preparation of procedure and execution of blowing process for the HP steam pipeline at KGHM Copper Smelter, Głogów
- 2018
Commissioning coordination with checking of all boiler systems before commissioning of a task: “Repowering of CFB-670 boiler at unit no. 2 at Turów Power Plant”.
- 2018
Operation of fire safety systems at power unit no. 11 at Kozienice Power Plant
- 2018
Commissioning coordination with checking of all boiler systems before commissioning at Turów Power Plant
- 2017
Process commissioning of power units 5 & 6 (2x900MW) at PGE GiEK S.A., Opole Power Plant
- 2017
Providing services in scope of support in process commissioning of power units 5 & 6 - 2x900MW at PGE GiEK S.A., Opole Power Plant
- 2017
Commissioning of FGD Plant for boilers K-1 and K2 at CHP Plant no. 2 at Grupa Azoty Zakłady Chemiczne “Police”.
- 2017
Commissioning of non-process switching stations at unit no. 11 at Kozienice Power Plant.
- 2017
Provision of commissioning engineers at Bihraj Tower, Vietnam.
- 2017
Chemical cleaning of pipelines in REMONTOWA SHIPREPAIR YARD S.A., Gdańsk.
- 2017
Provision of commissioning operator at Narva Power Plant, Estonia.
- 2017
Commissioning coordination at PKN ORLEN S.A, Płock CHP Plant
- 2017
Hot commissioning works completion for DeNOx SNCR Technology – B4 at Chvaletice Power Plant.
- 2017
Commissioning works of the boiler at GE Enerji Endustri Ticaret ve Servis Anonim Sirket, Karabiga, Turkey.
- 2017
Curing/drying of boiler refractory at Zofiówka CHP Plant.
- 2017
Neutralization of effluents after acid cleaning at ENEA Kozienice Power Plant
- 2017
Execution of specialist works at Shiprepair Yard in Gdynia.
- 2016
Commissioning of power unit system and equipment at ENEA Wytwarzanie S.A., Kozienice Power Plant
- 2016
Commissioning works at ENEA Kozienice Power Plant
- 2016
Commissioning coordination of unit equipment at Kozienice Power Plant
- 2016
Testing of samples and preparation of a concept and design for acid cleaning and blowing.
- 2016
Commissioning of CFB boiler with I&C part at Zofiówka CHP Plant.
- 2016
Participation in commissioning of K2 boiler at Siekierki CHP Plant.
- 2016
Chemical cleaning of boilers no. 4 and 5 at ENEA KOZIENICE Power Plant
- 2016
Acid cleaning and passivation of steam pipelines at KGHM Polska Miedź S.A. smelter
- 2016
Operation of biomass feeding system at Siekierki CHP Plant.
- 2016
Blowing process of OP-430 boiler for Erbud Industry Centrum at ZEC Poznań Veolia
- 2016
Acid treatment and passivation of cooling system of a blast furnace at Accelor Mittal Poland.
- 2016
Participation in commissioning at Thermal Waste Neutralization Plant, Pilsen, Czechia
- 2016
Acid cleaning and passivation of a heat recovery boiler at KGHM Polska Miedź S.A. Smelter.
- 2016
Preparation of blowing procedure and supervision of blowing process for two boilers Guardian Goole Glassworks, England.
- 2015
Full-scope commissioning and final tests at Tychy CHP Plant
- 2015
Commissioning coordination of units no. 3 and 4 at Łódź CHP Plant (EC-3)
- 2015
Provision of Commissioning Manager, Mjolby, Szwecja
- 2015
Commissioning of Municipal Thermal Waste Treatment Plant in Konin.
- 2015
CHEMICAL CLEANING OF BOILERS NO. 1 & 2 AT ENEA WYTWARZANIE SP. Z O.O.
- 2015
Start-up of TG1 and TG2 turbine generator units at Pątnów Power Plant.
- 2015
Supervision of commissioning works at ZTUOK KONIN.
- 2015
Acid cleaning of CFB boiler at Tychy CHP Plant.
- 2015
Commissioning works - Ledvice, Czech Republic.
- 2015
Alkaline boilout of OP-230 K6 boiler at Łódź CHP Plant.
- 2015
Blowing process of steam boiler and main steam pipeline at Konin Municipal Waste Treatment Plant
- 2015
Alkaline boilout of boiler under a task “Design and Construction of ZTUOK in Konin” at Konin Municipal Waste Treatment Plant
- 2014
Full-scope commissioning, test run and tuning run of retrofitted wet FGD Plants at Siekierki CHP Plant.
- 2014
Commissioning of wet FGD Plant at Wrocław and Kraków CHP Plants.
- 2014
Commissioning of coal handling system at Łódź CHP Plant (EC-3)
- 2014
Commissioning of all process equipment and systems of the power unit at Przyjaźń Coke Plant
- 2014
Management of FGD Plant commissioning of at Trebovice Power Plant.
- 2014
Chemical cleaning of boiler no. 7 evaporator at Kozienice Power Plant
- 2014
Commissioning of 21 Mwe turbine generator unit at Zgierz CHP Plant.
- 2014
Coordination of works during start-up of BC100 unit at Łódź CHP Plant (EC-4)
- 2014
Commissioning works at Stalowa Wola Power Plant.
- 2013
Commissioning works for boilers K6 - K1 - PKN ORLEN S.A., Płock CHP Plant.
- 2013
Erection of temporary system for chemical cleaning of boiler at 600MW K6 unit at Šoštanj Power Plant, Slovenia.
- 2013
Participation in commissioning works at Zgierz CHP Plant.
- 2013
Assessment of boiler no. 7 technical condition at Łagisza Power Plant
- 2013
Coordination of commissioning works at AR1.6 turbine generator unit at Starogard Gdański CHP Plant.
- 2013
Alkaline boilout and blowing of heat recovery boilers at Głogów and Polkowice CHP Plants
- 2013
Chemical recleaning of heating surfaces of OP-650 boiler no. 6 at TAURON Wytwarzanie S.A, Jaworzno III Power Plant.
- 2013
DeNOx system commissioning for OOG-420 boiler no. K7 at PKN Orlen S.A , Płock CHP Plant
- 2012
Chemical cleaning of evaporator of OP -650 boiler no. 1 and 7 at ENEA Połaniec Power Plant
- 2012
Commissioning of 20 MWe biomass-fired power unit at Elbląg CHP Plant
- 2012
Commissioning of combined cycle power units at Głogów and Polkowice CHP Plants.
- 2012
Full-scope commissioning of electricity generating system in Renewable Energy Source at Stalowa Wola CHP Plant.
- 2012
Operation of biomass system at Łódź CHP Plant
- 2012
Acid cleaning of fluidized bed boiler at Bielsko-Biała CHP Plant.
- 2012
Commissioning of BC50 power unit at Bielsko-Biała CHP Plant (EC1).
- 2012
Hiring of personnel for commissioning work at EVN Bioenergie Steyr, Austria.
- 2012
Hiring of personnel for commissioning work at Biofely SAS, France.
- 2012
Optimization of hydrocyclones and improvement of technology for units 5 and 6 in Dolna Odra Power Plant.
- 2012
Preservation of WR-40 boiler at ECO S.A. Opole.
- 2012
Commissioning of WR40 boiler and system at Tychy CHP Plant.
- 2012
Coordination and supervision of biomass system commissioning at Pątnów Power Plant
- 2012
Commissioning of turbine generator unit at Patnów Power Plant
- 2012
Coordination of biomass system commissioning at Konin Power Plant.
- 2012
Blowing of steam superheaters of OP-430 K-14 boiler at Siekierki CHP Plant.
- 2012
Chemical cleaning of OP-230 K2 boiler at Łódź CHP Plant (EC-4).
- 2012
Chemical cleaning and passivation of E-102 boiler at ZAK SA JB Nawozy.
- 2012
Commissioning coordination of process system for oil and gas fired boilers with total output 160 MWt at Zielona Góra CHP Plant
- 2011
Commissioning for the task "Conversion of Heat Generating Source in Opole - Construction of High Performance Cogeneration System" at ECO S.A. Opole
- 2011
Commissioning of FGD Plant at PGE GiEK S.A., Dolna Odra Power Plant
- 2011
Commissioning of process and EI&C parts of biomass feeding system at Dalkia Łódź CHP Plant
- 2011
Participation in commissioning of SCR system at PGNiG Termika S.A., Siekierki CHP Plant
- 2011
Acid cleaning of CFB-215 boiler at Pątnów Power Plant
- 2011
Chemical cleaning of OP -650 boiler no. 8 at ENEA Połaniec Power Plant
- 2010
Commissioning of FGD Plant for 858 MW unit PGE GiEK S.A., Bełchatów Power Plant
- 2010
Commissioning of wet FGD Plant at PGNiG Termika S.A., Siekeirki CHP Plant
- 2010
Participation in boiler commissioning at PGE GiEK S.A., Bełchatów Power Plant
- 2010
Chemical cleaning of OP-130 boiler at Kogeneracja S.A., Czechnica CHP Plant
- 2010
Commissioning works for fuel chemical energy system at coal handling system at PGE GiEK S.A. at Opole Power Plant.
- 2009
Commissioning of Water Treatment Plant PGE GiEK S.A., Bełchatów Power Plant
- 2009
Application of composite coating on OP-230 boilers at Gdańsk CHP Plant.
- 2009
Commissioning works at Fiddler’s Ferry in England.
- 2009
Blowing of steam pipelines (MS) to Hydrogen Generation II Unit at Lotos Rafinery
- 2009
Levelling of turbine generator unit at Gamrat S.A., Jasło
- 2009
Blowing process of HGU system pipelines at Lotos Rafinery
- 2009
Blowing process of Tz-12 main steam pipelines at PGNiG Termika, Żerań CHP Plant
- 2009
Blowing process of steam pipelines to OPR-15 turbine at Polkowice CHP Plant
- 2009
Commissioning of CCPP at Artctic Paper S.A.
- 2009
Commissioning of biomass co-firing system at ENEA Połaniec Power Plant
- 2009
Acid cleaning and blowing of pipelines at Lotos Gdańsk Refinery.
- 2008
Supervision of cleaning, blowing and commissioning of boiler at Sisak Refinery, Croatia.
- 2008
Supervision of commissioning of BC-50 unit at Kogeneracja S.A., Wrocław CHP Plant.
- 2008
Participation in commissioning works at Atherinolakkos Power Plant, Crete, Greece.
- 2008
Participation in commissioning of boilers at Alumar Rafinery, Brazil.
- 2008
Participation in turbine hall commissioning of 464 MW unit at Łagisza Power Plant.
- 2008
Chemical cleaning of WP-3 blast furnace at arcelor Mittal Poland
- 2008
Commissioning of heat generating device at Siekierki CHP Plant.
- 2008
Commissioning of gas-fired unit at Brzeg Dolny Power Plant
- 2008
Commissioning of OP-140 boiler at Energetyka Dwory Oświęcim.
- 2007
Process commissioning of slag feeding system at Pątnów Power Plant.
- 2007
Handling of process commissioning of turbine hall of the power unit at Pątnów II Power Plant
- 2007
Commissioning of 460 MW power unit at Tauron Wytwarzanie S.A., Łagisza Power Plant.
- 2007
Commissioning of slag handling system at Pątnów Power Plant.
- 2007
Commissioning of FGD Plant of 1-4 power units and draining system at Pątnów Power Plant.
- 2006
Mechanical supervision of coal handling system at Pątnów Power Plant
- 2006
“Turnkey” commissioning and start-up of boiler, FGD Plant and other works for 460 MW power unit (“A”) at Pątnów II Power Plant
- 2005
Participation in commissioning of turbine generator unit at Deva Power Plant, Romania.
Electrical and I&C Design Works
- 2022
PKP Energetyka Garbce - Construction of a hydrogen energy storage system.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2022
Vesuvius Skawina - Construction of a flue gas DeNOx system (SCR method) for seven process furnaces.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2021
PGE EC Kielce - Construction of a 5x32MWt gas fired boiler house.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2021
Promet-Plast - Construction of a high-efficiency trigeneration unit in Gaj Oławski - hydrogen system.
Replacement Building Permit Design, Basic Engineering. Coordination of detailed designs.
- 2021
ENEA Elektrownia Połaniec - Installation of a steam air heater for coal pulverizers and execution of an ECO by-pass for OP-650 boiler .
Participation in Building Permit Design preparation. Detailed designs in I&C part.
- 2021
ENEA Elektrownia Połaniec - Replacement of drives of FD and ID fans with installation of inverters for OP-650 boiler
Participation in preparation of Building Permit Design, Basic Engineering and Detailed Designs in electrical and I&C part in scope of retrofit of existing 6kV switchgears, cable management, field I&C and lighting systems.
- 2020
PGE Elektrownia Opole - Adaptation of emission monitoring systems at power units 1-6 to BAT requirements.
Detailed designs in electrical and I&C part in scope of modification of existing flue gas monitoring systems and their power supply.
- 2020
JSW Dąbrowa Górnicza - Construction of a flue gas DeNOx system (SCR method) for 71MW power unit.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2020
RADPEC S.A. “Północ” and “Południe” Heat Generation Plants - Adaptation of heat sources to BAT conclusions (7 x WR-25).
Coordination of third-party companies in scope of designs in electric and I&C part under flue gas DeNOx, DeSOx and dust separation systems delivered.
- 2020
RADPEC S.A. “Południe” Heat Generation Plant - Adaptation of heat sources to BAT conclusions (2 x WR-25).
Detailed designs in scope of main power supply switchgears, cable management, field I&C and lighting systems.
- 2019
PGNiG Żerań - Construction of a mercury reduction plant, modification of DeNOx and DeSOx systems.
Coordination of third-party companies in scope of designs in electric and I&C part under flue gas cleaning systems delivered. Detailed designs in automation part in scope of I&C equipment installation.
- 2019
OPEC INEKO Grudziądz - Construction of DeNOx and dust separation systems for two WR-25 boilers.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2018
OPEC INEKO Grudziądz - Construction of flue gas DeNOx, DeSOx and dust separation systems for three OR-32 boilers.
Building Permit Design, Basic Engineering, Detailed Design in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2018
PGE Elektrownia Dolna Odra - Construction of a flue gas DeNOx system (SCR method) at power units no. 5, 6, 7, 8.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2018
PGE Elektrownia Opole - Construction of a DeNOx system (SNCR method) at power units no. 1, 2, 4 (NOx below 150mg/Nm3 program).
Basic Engineering and detailed designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, lighting systems.
- 2018
Synthos - Conversion of OP-130 to gaseous fuel.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2017
PGE EC Bydgoszcz - Construction of DeNOx and dust separation systems for two OP-230 boilers.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2017
CEZ Skawina - Construction of a DeNOx system (SCR method).
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2017
PGNiG EC Siekierki - Construction of a DeNOx system (SNCR method) for WP-120 boilers no. K5, K6, K7 .
Building Permit Design, Basic Engineering, Detailed Design in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2016
Unipetrol Litvinow - Construction of a DeNOx system (SNCR method) at boilers no. K14, K15, K16, K17, K18, K19.
Basic Engineering and detailed designs in electrical and I&C part.
- 2016
PGE Elektrownia Opole - Construction of a DeNOx system (SNCR method) at power unit no. 3 (NOx below 150mg/Nm3 program).
Basic Engineering and detailed designs in electrical and I&C part.
- 2010-2015 coordination of designs
Veolia EC Karolin - Retrofit of OP-430 boilers (2K & 3K) and OP-140 boiler (1K2) aiming at NOx reduction.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
PGE Elektrownia Turów - Construction of a flue gas DeNOx system (SNCR method) at power units no. 4, 5, 6
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
EC Będzin - Construction of a flue gas DeNOx and DeSOx system (SNCR method) for OP-140 boilers (K6 & K7) and WP-70 boiler (K5)
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
ZEPAK Pątnów - Retrofit of OP-650 boilers (K1 & K2) with installation of a DeNOx system for these boilers.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
ZEPAK Pątnów - Construction of a DeNOx system for OP-650 boiler (K5).
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2022
PKP Energetyka Garbce - Construction of a hydrogen energy storage system.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2022
Vesuvius Skawina - Construction of a flue gas DeNOx system (SCR method) for seven process furnaces.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2021
PGE EC Kielce - Construction of a 5x32MWt gas fired boiler house.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2021
Promet-Plast - Construction of a high-efficiency trigeneration unit in Gaj Oławski - hydrogen system.
Replacement Building Permit Design, Basic Engineering. Coordination of detailed designs.
- 2021
ENEA Elektrownia Połaniec - Installation of a steam air heater for coal pulverizers and execution of an ECO by-pass for OP-650 boiler .
Participation in Building Permit Design preparation. Detailed designs in I&C part.
- 2021
ENEA Elektrownia Połaniec - Replacement of drives of FD and ID fans with installation of inverters for OP-650 boiler
Participation in preparation of Building Permit Design, Basic Engineering and Detailed Designs in electrical and I&C part in scope of retrofit of existing 6kV switchgears, cable management, field I&C and lighting systems.
- 2020
PGE Elektrownia Opole - Adaptation of emission monitoring systems at power units 1-6 to BAT requirements.
Detailed designs in electrical and I&C part in scope of modification of existing flue gas monitoring systems and their power supply.
- 2020
JSW Dąbrowa Górnicza - Construction of a flue gas DeNOx system (SCR method) for 71MW power unit.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2020
RADPEC S.A. “Północ” and “Południe” Heat Generation Plants - Adaptation of heat sources to BAT conclusions (7 x WR-25).
Coordination of third-party companies in scope of designs in electric and I&C part under flue gas DeNOx, DeSOx and dust separation systems delivered.
- 2020
RADPEC S.A. “Południe” Heat Generation Plant - Adaptation of heat sources to BAT conclusions (2 x WR-25).
Detailed designs in scope of main power supply switchgears, cable management, field I&C and lighting systems.
- 2019
PGNiG Żerań - Construction of a mercury reduction plant, modification of DeNOx and DeSOx systems.
Coordination of third-party companies in scope of designs in electric and I&C part under flue gas cleaning systems delivered. Detailed designs in automation part in scope of I&C equipment installation.
- 2019
OPEC INEKO Grudziądz - Construction of DeNOx and dust separation systems for two WR-25 boilers.
Building Permit Design, Basic Engineering, Detailed Designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2018
OPEC INEKO Grudziądz - Construction of flue gas DeNOx, DeSOx and dust separation systems for three OR-32 boilers.
Building Permit Design, Basic Engineering, Detailed Design in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2018
PGE Elektrownia Dolna Odra - Construction of a flue gas DeNOx system (SCR method) at power units no. 5, 6, 7, 8.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2018
PGE Elektrownia Opole - Construction of a DeNOx system (SNCR method) at power units no. 1, 2, 4 (NOx below 150mg/Nm3 program).
Basic Engineering and detailed designs in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, lighting systems.
- 2018
Synthos - Conversion of OP-130 to gaseous fuel.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2017
PGE EC Bydgoszcz - Construction of DeNOx and dust separation systems for two OP-230 boilers.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2017
CEZ Skawina - Construction of a DeNOx system (SCR method).
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2017
PGNiG EC Siekierki - Construction of a DeNOx system (SNCR method) for WP-120 boilers no. K5, K6, K7 .
Building Permit Design, Basic Engineering, Detailed Design in electrical and I&C part in scope of main power supply switchgears, control switchgears, cable management, field automatic control, fire-fighting, lighting systems.
- 2016
Unipetrol Litvinow - Construction of a DeNOx system (SNCR method) at boilers no. K14, K15, K16, K17, K18, K19.
Basic Engineering and detailed designs in electrical and I&C part.
- 2016
PGE Elektrownia Opole - Construction of a DeNOx system (SNCR method) at power unit no. 3 (NOx below 150mg/Nm3 program).
Basic Engineering and detailed designs in electrical and I&C part.
- 2010-2015 coordination of designs
Veolia EC Karolin - Retrofit of OP-430 boilers (2K & 3K) and OP-140 boiler (1K2) aiming at NOx reduction.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
PGE Elektrownia Turów - Construction of a flue gas DeNOx system (SNCR method) at power units no. 4, 5, 6
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
EC Będzin - Construction of a flue gas DeNOx and DeSOx system (SNCR method) for OP-140 boilers (K6 & K7) and WP-70 boiler (K5)
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
ZEPAK Pątnów - Retrofit of OP-650 boilers (K1 & K2) with installation of a DeNOx system for these boilers.
Coordination of third-party companies in scope of designs in electric and I&C part.
- 2010-2015 coordination of designs
ZEPAK Pątnów - Construction of a DeNOx system for OP-650 boiler (K5).
Coordination of third-party companies in scope of designs in electric and I&C part.