Retrofit projects in power industry and other sectors

modernizacje_DSC_0017.jpgSBB ENERGY S.A. offers a comprehensive modernization of boilers on a turnkey basis, to reduce NOx emission in flue gas

Retrofit projects in the power sector and industry

SBB ENERGY S.A. offers the end-to-end  retrofits of boilers on a turnkey basis, to reduce NOx emission in flue gas below 200 mg/Nm3 with primary measures, and below 180 mg/Nm3 with primary measures combined with non-catalytic reduction of NOx.

 Under the retrofit projects to reduce emission below 200 mg/Nm3 we offer:

  • Primary method of NOx emission reduction
  • Designing of required systems in all disciplines (obtaining the construction permit)
  • Execution of all deliveries
  • Required dismantling of systems which collide with newly designed installations
  • Retrofits of electric switchgears 
  • Erection/installation works 
  • Construction/civil works 
  • System start-up and optimization of boiler operation
  • Theoretical and practical training of operating and maintenance personnel in scope of new systems
  • Handover for operation together with obtaining the occupancy permt

Under the retrofit to reduce emission below 180 mg/Nm3 we offer:

  • Primary measures of NOx emission reduction and non-catalytic reduction of NOx emission (urea injection)
  • Designing of required systems in all disciplines (obtaining the construction permit)
  • Execution of all deliveries
  • Required dismantling of systems which collide with newly designed installations
  • Retrofits of electric switchgears
  • Erection/installation works 
  • Construction/civil works 
  • System start-up and optimization of boiler operation
  • Theoretical and practical training of operating and maintenance personnel in scope of new systems
  • Handover for operation together with obtaining the occupancy permit

In addition, SBB ENERGY S.A. offers retrofits of boilers to adapt them for biomass co-firing up to 100% of fired biomass:

  • This technology is based on milling the pellets in hammer and roller mills
  • Designing of required systems in all disciplines (obtaining the construction permit)
  • Execution of all deliveries
  • Required dismantling of systems which collide with newly designed installations
  • Retrofits of electric switchgears for the needs of system for co-firing
  • Erection/installation works for the needs of system for co-firing
  • Civil/construction works for the needs of system for co-firing
  • System start-up and optimization of boiler operation
  • Theoretical and practical training of operating and maintenance personnel in scope of new systems
  • Handover for operation together with obtaining the occupancy permit